Opened POWERCON container from which the module rows are laid out on the meadow
das.baseEnergy components · Mobile energy

The solar power plant in a container.

POWERCON is the mobile PV system in a 20-foot high-cube container: 184 modules with a total of 120 kWp arrive fully pre-assembled, the 110 kW inverter is optionally on board. Set up, connect, energy – after around one day, your site supplies its own solar power, on the grid or off-grid.

120kWpper container
approx. 1dayStructure
20ftContainer
The starting situation without a grid

Lots of space, lots of demand – and no suitable connection.

Gravel works, quarries, large construction sites and temporary locations need a lot of electricity, but are rarely next to a powerful grid connection. Until now, a diesel generator has usually filled the gap.

01
No grid within reachThe nearest powerful connection is far away – or too small for the demand on site.
02
Diesel running continuouslyGenerators run non-stop. Fuel has to be delivered, stored and topped up.
03
Temporary locationConstruction sites and extraction areas move on. A permanently built PV system would be left behind.
04
Area remains unusedFree areas on site lie idle, even though the sun delivers energy there day after day.
05
Long lead timeConventional ground-mounted systems need planning, foundations and installation on site – too much effort for a temporary deployment.
The turnaround

A container arrives. The next day the power plant is up and running.

POWERCON brings the complete solar array in a 20-foot high-cube container. On site, the pre-assembled module rows are laid out on rails and connected – a team of four needs around one day for this. When the site moves on, the power plant moves with it.

  • 120 kWp from one 20-foot container
  • Inverter with 110 kW optionally on board
  • Can be used on-grid and off-grid
Enquire about POWERCON
Opened POWERCON container with the module packs, in front of it the rails for the solar array
POWERCON · mobile PV system in a container
What sets POWERCON apart

Set up. Connect. Energy.

POWERCON is the mobile plug & play solution for sites where power is needed before a grid is available – or only for a limited time.

01
MobileOne 20-foot high-cube container. Transport by truck, ship and rail – with completely normal container logistics.
02
EconomicalOne system for many sites: fold it in after the deployment and set it up again at the next location.
03
Plug & Play184 modules are fully pre-assembled, the 110 kW inverter is optionally on board. Set-up in around one day.
04
Scalable120 kWp per container. If the site needs more power, additional containers are added.
05
RobustContainer in corrosivity category C4, mounting system in C3. The inverter operates from −25 °C to +65 °C.
POWERCON container with module rows laid out
POWERCONPOWERCON PC20HQ – technical data
120kWp
per 20-foot container
184pcs
TOPCon modules with 650 Wp each
110kW
Inverter (optional)
Data sheet

Everything the planners want to know.

Model
Powercon PC20HQ
PV rated output
120 kWp · 184 × 650 Wp
PV modules
184 pieces · TOPCon
Module dimensions
2382 × 1134 × 30 mm
Design
20HQ – 20-foot high cube
Container dimensions
L × W × H – 6058 × 2438 × 2896 mm
Extended dimensions
L × W × H – 115 × 6 × 1.3 m
Weight
15 tonnes
Mounting system
Frame construction (46 pieces) on rails; rails, supports and support elements
Module tilt
15° ± 5°
Corrosivity category
Container C4 · mounting system C3
Accessories and services
Cables, electric cable winch
Inverter (optional)
Grid-connected (on-grid) · 1 piece · 110 kW rated AC output, max. 121 kW
Maximum PV power Pmax
120 kW
AC rated voltage
3L/N/PE · 220/380 V or 230/400 V; 50 Hz, 60 Hz optional
Maximum AC output current
166.7 A / 159.4 A
Operating temperature
−25 °C to +65 °C; power reduction above +45 °C
Communication
RS485 / RS232 / WiFi / LAN / Bluetooth / 4G
Total installation time
approx. 1 day with a team of 4 people
Max. slope of installation area
< 0.65%
Orientation
Any orientation possible
Transport
20-foot container by truck, ship and rail
POWERCON in use

From container to solar array.

This is what it looks like when a POWERCON arrives: open the container, lay out the rails, pull out the module rows, connect. The video shows POWERCON in use, the photos show set-up and ongoing operation.

Set-up and operation14 FOTOS
01 / 14
Installation

What your site needs to provide.

A free, level area and access for the truck – POWERCON doesn't need any more. We clarify four points together in advance.

We take care of that.

From checking the site to moving on to the next – from a single source.

  • Site and area check
  • Transport and delivery
  • Set-up and commissioning
  • Grid connection or off-grid operation
  • Monitoring via das.os
  • Dismantling and relocation
01

Area

When extended, one container occupies around 115 × 6 m. Any orientation is possible, the modules are tilted at 15° ± 5°.

02

Substrate

A level installation area with a maximum slope of 0.65% – meadow, gravel or paved area.

03

Access

The 20-foot container weighs 15 tonnes and arrives by truck. We help plan unloading and placement.

04

Connection

With the optional inverter 3L/N/PE 230/400 V or 220/380 V – into the existing grid or with storage into an off-grid system.

Part of the mobile system

POWERCON generates – das.base turns it into supply.

Generated in the solar array, stored in the POWERCUBE, controlled via das.os. Every component knows the others – and moves on after the deployment.

POWERCON mobile solar array
1Generate
POWERCON

120 kWp per container – the solar array that moves with the site.

POWERCUBE mobile storage
2Store
POWERCUBE

Mobile storage – bridges the night and load peaks.

Loads on site
3Use
Loads

Machines · containers · charging points · construction power

Site manager with das.os dashboard on a tablet in front of a container park
4Control
das.os

Yields, states of charge and loads in view live.

Non-binding deployment check

Where should your solar array be located?

Send us the key data on location, area and demand. We check how many containers make sense, whether storage is needed and how the system is connected to the grid or run off-grid.

Step 01 · Location1 / 3
01

Where is the power needed?

Deployment, area and grid connection are enough for an initial design.

Frequently asked questions

What you should know about POWERCON.

184 TOPCon modules with 650 Wp each on a frame construction with rails, plus cables and an electric cable winch – all in one 20-foot high-cube container. Together that makes 120 kWp per container. An inverter with 110 kW is optionally available.

Contact

Personal consultation

+43 2622 35001office@daskraftwerk.biz
POWERCON

We check area, access and demand, design the number of containers and the storage and support set-up, connection and relocation.